Computerized Classroom Construction


The construction of the classroom was almost completed on January 12 at which point the installation of the computers started. The room was connected to the B&L network. Below you will find two photos showing the now connected network switch, and the pile of boxes in the switch room which contained the computers that are now installed in the classroom.

     

Finally, after all those months of planning and construction, I could look through the entrance of B&L 407C and see the computerized classroom:


 Goto previous page

Goto next page