PHOBOS Time-of-Flight Wall
Installation in IR Complete
The pictures below were taken after the installation of the
PHOBOS time-of-flight wall in the IR was completed on 11/22/99.
Cable connections for the TOF section installed in the magnet
(left) and for the TOF section that rests on the floor (right)
![](DSC00011.JPG) |
![](DSC00013.JPG) |
Front views of the TOF sections installed in the magnet (top)
and on the floor (bottom).
![](DSC00019.JPG) |
![](DSC00018.JPG) |
View of the two time-of-flight sections installed in their final
position in the IR.
![](DSC00014.JPG) |
![](DSC00015.JPG) |
View of time-of-flight wall from between the magnet poles.
![](DSC00008.JPG) |