PHOBOS Time-of-Flight Wall

Installation in IR Complete


The pictures below were taken after the installation of the PHOBOS time-of-flight wall in the IR was completed on 11/22/99.

Cable connections for the TOF section installed in the magnet (left) and for the TOF section that rests on the floor (right)

 

 

Front views of the TOF sections installed in the magnet (top) and on the floor (bottom).
 
 

View of the two time-of-flight sections installed in their final position in the IR.
   

View of time-of-flight wall from between the magnet poles.