Status of the T0 detector array
Four 2-inch PMTs on each side of IP
Coupled to 3 cm of UVT (BC-800).
Sparking problems resolved.
Gain matched within +/- 10%.
Approximately time-matched in hardware
No slewing correction yet.
Previous slide
Next slide
Back to first slide
View graphic version