Here are a few pictures of the first part of the T0 support structure. This is the Ultem holder of the 4 PMTs that are installed on either side of the IP. The paper template taped on the surface of the bottom part will be used to align the stand with respect to the beam pipe. Ray Teng has build a mockup of the beam line so that we can practice installing the support structure before installation at RHIC.
|
|
|
|
© Frank L. H. Wolfs, University of Rochester, Rochester, NY 14627, USA
Last updated on Friday, April 13, 2001 12:02