PHOBOS Engineering Run:June 1999 - August 1999
Engineering run has been an incredible opportunity to test PHOBOS hardware, software, and people
It exposed how the PHOBOS hardware, software, and people respond to the harsh RHIC environment:
- Temperature
- Humidity
- Beam-induced background
- Radiation damage