The 12-dynode version of the R5900.
Continued the evaluation of the 12-dynode version of the R5900 PMT.
- One PMT failed (significant loss in pulse height).
- Resolution is slightly worse than the 10-dynode version.
Engineers from Japan came to Rochester on 11/18.
- Discussed gain and uniformity specifications.
- Agreed on factory inspections and tests.