Final Remarks
The TOF wall has been in place since late November ‘99.
- The system is well understood and is ready for physics.
Two more walls are slated for construction and are likely to be positioned on the other side of the Phobos magnet.
- The scintillators and light guides are ready for assembly and quality testing.
Updates can be seen at
- http://phobos-srv.chm.bnl.gov
- http://teacher.pas.rochester.edu