Computerized Classroom Construction


The classroom was painted during the last week of December. In addition, all electrical work to the classroom was finished during this period. This following photo shows a view of the classroom from the entrance.

The white boards will be delivered on January 12. They will be installed in the center of the room and on one side. The following photo shows a view of the entrance of the classroom, viewed from the back of the room. The white boards will be installed in the big "holes" on either side of the door.

The network cables were also installed during the last week in December. There are 6 CAT-V network cables pulled to each table. Two of these will be used for the current computer system, and the remaining 4 will be used for potential future upgrades. The following photo shows the power (left conduit) and network (right conduit) connections to the tables.

And this is where we are going to put the network switch: